I.
Multiple Choice: Read the questions carefully and choose the best answer from
the option given. Write your answer before the number.
1.
It refers to the actions carried out to retain an item or restore it to an acceptable condition.
C Maintenance Schedule
Maintenance
a.
b.
Maintenance Program
d
Quality Management
2. A comprehensive list of maintenance and its incidents.
a. Maintenance
C. Maintenance Schedule
Quality Management
b. Maintenance Program
d
3. A list allocating specific maintenance of an area. Equipment and tools for a specific period.
a. Maintenance
C.
d.
Maintenance Schedule
Quality Management
b. Maintenance Program
4.
A method for ensuring that all the activities necessary to design, develop and implement a
product or service are effective concerning the system and its performance.
a. Maintenance
c. Maintenance Schedule
b. Maintenance Program
d. Quality Management
5. These performed to identify, isolate and rectify a fault so that the failed equipment or system
can be restored to operational conditions within the tolerances or limits. Act
a. Corrective Maintenace
c. Maintenance Program
b. Maintenance Schedule
d. Quality Management
6. The OER statnd for
a. Original Materials Equipment
c. Original Manufacturer Equipment
d. Original Management Equipment
b. Original Manufacturer Evalute
7. Planning and preparing a systematic maintenance procedure are a good idea and
opportunity to save time, money, and frustration.
a. True
b. false
c. not sure
d. a and c
8. Things that we need to consider in maintening our facilities.
a. Safe
b. Cost
c Delivery
d. All of the above
9. Planning and preparing a systematic maintenance procedure are a good idea and
opportunity to save
a. Frustration
b. Money
c Time
d. All of the above
10. Preventive maintenance is divided into two sub groups
a. Planned Maintenance and Condition Based Maintenance
b. Planned Maintenance and Unplanned Maintenance
c. Condition Based Maintenance and Corrective maintenace
d. None to the above
1